How much do you know about the finished product protection of aluminum templates?

Release time:2019.08.14
View:

  Aluminum template manufacturers analyze the finished product protection of aluminum templates:

  1. For materials that must be installed and are prone to damage or loss, the equipment and equipment in the machine room should be installed after forming a closed condition, and a dedicated person should be assigned to manage them. The power distribution and control room should not be used as temporary construction on site. After the installation is completed, if other contractors enter the construction site, they must register and take protective measures before starting the construction. After the construction is completed, they must be inspected in a timely manner. If any damage is found, they should immediately report to the project manager, who will coordinate with the responsible party to solve the problem.

  2. The protection of finished products during the decoration and installation stages, especially during the closing and completion stages, is particularly important and must be carried out in accordance with the requirements of the finished product protection plan.

  How much do you know about the finished product protection of aluminum templates?

  The installation of mechanical and electrical lighting fixtures and panels should be carried out in a staggered manner with the construction of the wall and ceiling. The sequence is as follows: before the ceiling keel lifting construction starts but is not completed, the installation of lighting fixtures, air conditioning vents, smoke detectors, spray heads, etc. should be carried out. Before the wall is coated with the next coat of paint, the installation of lighting fixtures, panels for switch sockets, etc. should be carried out. When installing lamps and panels, clean white gloves should be worn to keep the walls and ceilings clean, and plastic films and tape should be used to wrap them. After the installation of the mechanical and electrical surface layer is completed, it should be handed over to the civil engineering department before the final construction can be carried out.

  4. The generator units, high and low voltage switchgear, water pumps, fan coils, and air conditioning equipment in the equipment room are all protected with plastic film and external solid packaging boxes to prevent external factors such as dust. Two ends of the interface are reserved for pipeline connection.

  5. Important control boxes and panels should be marked with obvious "no touch" signs after being powered on to prevent unauthorized personnel from touching them, causing misoperation and equipment damage.

  6. When lifting large equipment, it is necessary to reasonably select the lifting points, add soft pads to the binding points of the rope on the equipment and accessories, and install them in sequence to avoid rework.

  7. After the construction of all types of mechanical and electrical pipelines is completed, they must be inspected and approved by the general contractor and the supervisor before being handed over to the general contractor and other professional contractors.

  8. The company will adhere to the corporate tenet of "professionalism, safety, efficiency, and environmental protection", strive to become a high-quality professional service provider in the field of aluminum alloy templates, and make due contributions to the construction of a "resource saving and environmentally friendly" society. The company is willing to sincerely cooperate with friends at home and abroad, work hand in hand, develop together, and create a win-win future!