The design, research and construction application of aluminum alloy building formwork is a major development in the construction industry. Aluminum formwork construction is popular mainly because the technical indicators are more advanced and can better meet the requirements of construction projects. Solved the shortcomings of traditional templates in the past, greatly improving construction efficiency. It has advantages such as short construction cycle, long practical life, low cost, simple support, good stability, high bearing capacity, wide application range, few splices, high accuracy, standard, strong universality, high construction quality accuracy, and low-carbon emission reduction. However, due to the good adsorption and poor ductility of aluminum templates, it is difficult to remove the concrete adhering to them after construction.
Cleaning method:
The traditional methods for removing concrete from aluminum templates include vibration, acid washing, or shot blasting.
The use of traditional vibration is time-consuming and laborious, and the processing is not thorough; Thirdly, it is easy to cause template deformation;
Using traditional pickling and soaking; Firstly, it does not comply with national environmental policies, resulting in secondary pollution. Secondly, it will react violently with aluminum, affecting the service life of aluminum templates; Thirdly, the site also has an impact on the physical health of construction personnel;
Using traditional shot blasting technology: it will cause significant wear on the surface of the aluminum template, greatly reducing the number of cycles of aluminum template utilization; Sprayed aluminum templates have a greater impact on the surface.
The new intelligent fully automatic high-pressure cleaning line for aluminum molds can perfectly replace traditional methods. The cleaning of aluminum templates is fast and clean. The automatic high-pressure water cleaning line uses tap water as the medium for pure physical cleaning, without any damage to the surface of the aluminum template. It better removes residual concrete and cement on the aluminum template, with high efficiency, no pollution, reduced labor, and increased service life and cycle usage of the aluminum template.
Cleaning efficiency of building aluminum template cleaning machine:
1. The conventional speed of the aluminum template cleaning line is 4~6m/min; It can be adjusted according to the degree of concrete on the surface of the aluminum formwork on site;
2. Water can be recycled to save energy and reduce emissions;
3. The cleaning height and width are adjustable, suitable for cleaning standard versions and the vast majority of irregular parts, C-slots, etc;
4. The shortest safe cleaning length is 50cm; Unlimited length;
5. Currently, the width of the washable board is 60cm; Adjust the height to 20cm;
6. The length of the conveyor line, cleaning width and height can be customized according to customer requirements
7. It is recommended to use a 500bar small cleaning machine with a high-pressure cleaning handheld gun for cleaning special shaped parts such as slots C;
Service guarantee:
Pre sale:
Provide a detailed explanation of the specific process and parameters of the aluminum template washing line, and patiently answer relevant technical inquiries from users;
Customize a more suitable and cost-effective fully automatic aluminum template cleaning line for users based on their on-site application needs;
Dispatch company technical personnel to the site for inspection, planning and designing installation process diagrams for users' reference;
After sales:
Strict testing, trial operation, and customer acceptance before the product leaves the factory are arranged for shipment to the site.
The company strictly arranges the production of necessary equipment and accessories in accordance with the contract content;
When the aluminum template fully automatic cleaning line arrives at the site, technical personnel will be arranged to guide the installation and equipment debugging on site;
Technical personnel are responsible for training, technical guidance, and subsequent maintenance of on-site operators;
After the installation and debugging are completed, dedicated technical personnel will be left to assist the customer in production for 1-2 days for free. Only after normal operation and confirmation by the customer, can they return.